Thursday, 31 May 2018

More Steps


The steps from drive to garden have now been cast.

The top step is now above the level of the grass  so I have some landscaping to do.

 The steps between the two terraces now done. Area on the right is for a water butt.

Centre and corner step

A small foundation was also laid to support a planter which will hold a flowing climber of some sort to grow up an over an arbour which I will construct in due course.

Rough plan of the arbour/windbreak. Two standard fence panels will be set at the back of each 1.8m bay. Hope fully flowering climber will grow up and over before too long. A rose of some sort will give us most blooms for longer than a glycine.

No comments:

Post a Comment