4 sides and roof beam

After a frantic hour or so the 4 sides were loosely bolted together and attached to the base.






The ridge beam was then added and someone went around checking for squareness.


Rafters and bracing ties have since been added and we unpacked all the glass so that I could make the two halves of the stable door and the two opening windows. According to the manual I need to slide the windows in place and fit the door before I ensure the whole thing is square and then I can fit the glass. Hoping that another couple of days should have it finished.